Earthwork Cut and Fill Calculations
In Situ, bank measure: soil as it is currently on-site. This is soil that has supposedly been at rest for a while. Even if it was compacted initially it has expanded gradually over to time to be at its …
اقرأ أكثرcm 2113 test 2 Flashcards
Study with Quizlet and memorize flashcards containing terms like The three basic components of soil are _____, _____, and _____., For bulk materials, volumetric measure varies with the material's position in the construction process., The same weight of a material will occupy different volumes as the material is handled on the project. and more.
اقرأ أكثرRate Analysis of Excavation in Earthwork -Calculate Cost of …
Rate analysis of excavation in earthwork is the measure of quantity of excavation to be carried out, the cost of equipment, machineries and labors required for the same. The cost of …
اقرأ أكثرMaterial Density Tables To Help Estimate Earthwork Volumes …
Calculating appropriate volume is critical to accuracy. In-bank soil, loose soil that has been excavated and fill soil that has been compacted, have different material densities and resulting …
اقرأ أكثرCEE 422-FA23-Assg3-Sol.pdf
Table 1 Assignment Case RS Means (2023) Matched Item* Excavating Operation 31.23.16.42-0020 For loading onto trucks, add 15% (see Figure 1) AND 31.23.16.42-0300 EXCAVATING, BULK BANK MEASURE Excavator, hydraulic, crawler mtd., 3 C.Y.cap = 260 C.Y./hr (see Figure 1) AND 31.23.16.42-4000 For soft soil or sand, deduct 15% (see Figure 1) …
اقرأ أكثرEstimating Earthwork Volumes
There are actually three types of soil volumes: bank volumes, loose volumes, and compacted volumes. Bank volumes are measurements of soil quantities already in the ground. These are the direct measurements …
اقرأ أكثرSolved A 3-yd dragline is excavating and stockpiling sand
A 3-yd dragline is excavating and stockpiling sand and gravel. Average depth of cut is 5.4 ft, average swing angle is 90°, and job efficiency is 40 min/h. Estimate the dragline's hourly production in bank measure.
اقرأ أكثرCALCULATING VOLUMES AND WEIGHTS IN …
Excavation increases the volume of material. It is therefore necessary to use a bulking factor to determine the volume of material that will be created by excavation. Bulking factor is defined …
اقرأ أكثرPPT
3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine is excavating sand and gravel. 3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine is excavating …
اقرأ أكثرExcavation Calculator
This calculator will calculate the volume of excavated material using the length and width of the excavation in feet and the excavation depth from an average of four points. It will calculate the volume increase of the material using the …
اقرأ أكثرCEE 422-FA19-Assg3-Sol.pdf
Table 1 Assignment Case RS Means Matched Item* Excavating Operation 31.23.16.42-5400 EXCAVATING, BULK BANK MEASURE Excavator, hydraulic, crawler mtd., 3 C.Y.cap = 300 C.Y./hr (see Figure 2) AND 31.23.16.42-5020 For loading on trucks, add 15% (see Figure 2) AND 31.23.16.42-4000 For soft soil or sand, deduct 15% (see Figure 1) AND 31.23.16.42 ...
اقرأ أكثرCEE 422 HW3 .docx
Estimate the total cost and the cost per cubic yard, bank measure, for excavating and hauling the earth. ... 5150 Item Name Excavation and Fill → Excavating, Bulk Bank Measure → Excavator, hydraulc, crawler mtd. → 1-1/2 C.Y. cap Crew 12A 1 Equip. Oper. (crane) ...
اقرأ أكثرWhat are bulk excavations
Bulk excavations involve the removal of large amounts of soil, rock, or other material from site, in preparation for a construction project. Excavations are often required for residential or commercial projects to bring the land to the …
اقرأ أكثرSolved A contractor in Los Angeles, California, needs to
Labor Equip. Total Excavating, bulk bank measure 31 23 16.42 3 CY capacity, B10P 1300 front-end loader, track mounted 1040 0.48 0.97 1.45 1.29 Excavating, bulk 31 23 16.42 bank measure, 4100 for heavy soil or stiff clay, add 60% 60% Excavating heavy soil, bulk bank measure, 31 23 16.42 3 CY capacity, B10P 1300/4100 front-end loader, track ...
اقرأ أكثرLOADING AND EXCAVATION LECTURE 4.pdf
The units used are customarily bank (solid) measure, the volume of material in place (in-situ). In dealing with haulage units, however, loose (broken) measure, the volume of material after excavation, is employed. If actual values cannot be obtained, the following approximate measures of specific weight may be used: 09/12/2015 17
اقرأ أكثرSolved A 4 cu yd (heaped) hydraulic shovel with a | Chegg
Estimate the shovel's hourly production in bank measure. A 4 cu yd (heaped) hydraulic shovel with a bottom-dump bucket is excavating tough clay. The swing angle is 120° and job efficiency is 50 min/h. Estimate the shovel's hourly production in bank measure.
اقرأ أكثرSolved Situation:
- State your assumptions and concerns if you have any. 31 it 3 Excovation and 3123 Excavation and Fill 0010 EXCAVATING, UTIUTY TRENCH 0011 Cenmen satil 312316.42 Excavating, Bulk Bank Measure प1010 EXCAVATING, BULK BANK MEASURE 007l Conrmen enth pilat 628 For customer support on your Residential Costs with RSMeans data, call 800.448.8182.
اقرأ أكثرEstimating Earthwork Volumes
Bank volumes are measurements of soil quantities already in the ground. These are the direct measurements between existing grades and proposed excavation grades. Loose volumes are the volumes of soil that haven't been disturbed during excavation and removal and are placed in the back of dump trucks or in stockpiles in a loose condition ...
اقرأ أكثرCM 2113 Exam 2 Flashcards
For bulk materials, volumetric measure varies with the material's position in the construction process. ... the soil by digging. Loose Volume. Which of the following soil volume is used to determine the volume capacity of excavating and hauling equipment? Weight. Soil density is a measure of _____ per unit of volume. Natural. A soil's bank ...
اقرأ أكثرSolved Below is a figure from the R/S/ Means Building
DAILY LABOR 2001 BARE COSTS 31 23 16.42 Excavating, Bulk Bank Measure 0010 | EXCAVATING, BULK BANK MEASURE 。|( : :m, R31 2316401 00Comoned 0020For loing nto ruds, acd 0050.1 For mobil zoon nd mobili, se Dr01 5436.50, : R31231645 0100 For hauling, see Dwv. 31 23 23.20 0200 Excneto, bydaulc, crowermld, 1 CY. cop 100 CY/h. 0250 0260 .
اقرأ أكثرCEE 422-SP16-Assg3-Sol
View CEE 422-SP16-Assg3-Sol from CEE 422 at University of Illinois, Urbana Champaign. University of Illinois at Urbana-Champaign Department of Civil and Environmental Engineering CEE 422-Construction
اقرأ أكثرSolved Problem 4: (20 points) Estimate the actual bucket
The shovel is excavating sand and gravel. Show transcribed image text. Here's the best way to solve it. Solution. View the full answer. Previous question Next question. Transcribed image text: Problem 4: (20 points) Estimate the actual bucket load in bank measure for a shovel bucket whose capacity is 2.29 m3. The shovel is excavating sand and ...
اقرأ أكثرExcavation Calculator
It will calculate the volume increase of the material using the swell/bulking percentage from Bank to Loose volume. A dump truck holds anywhere from 10 to 14 cubic yards of material. Length of Excavation: ft: Width of Excavation: ft: Depth Point A: ft: Depth Point B: ft: Depth Point C: ft:
اقرأ أكثرExcavating Online
This site is an online resource for individuals who are interested in or work in the excavating industry. We have a bulk excavation estimator and a forum. Home; Excavating 101; Estimator. Bulk excavation - Metric ... if you would rather use the standard measures version click here. Home Estimator Bulk ... distance the bank angles back in one ...
اقرأ أكثرMachine Excavation
Material Type: Notes; Class: Constr Contracting; Subject: Civil And Environmental Engineering; University: University of Michigan - Ann Arbor; Term: Unknown 1989;
اقرأ أكثرBankMeasure
We offer subscription and professional services that provide in-depth analysis of bank performance. Banks, associations, investment banks and other firms utilize our services for the following reasons: Compare your bank's performance to peers ; Monitor health of correspondence banks; Demonstrate compliance to bank regulators
اقرأ أكثرLoose Bulk Density and Swell Factor Measurement
1. The document describes procedures for measuring loose bulk density and swell factor for limonite and saprolite test pit samples. 2. Key steps include excavating a test pit, collecting and weighing in situ samples, then placing …
اقرأ أكثرCivil 3D Problem Set 1 .pdf
12 Table 3 Line Number Description Crew Daily Output Unit Daily Bare Cost Notes 312316420305 Excavating, bulk bank measure, 2.7 m3 capacity = 229 m3/hr, backhoe, hydraulic, crawler mounted, excluding truck loading B12D 1835 Bm3 $3339.70 For excavation of reclamation and cut material 312323208170 Cycle hauling (wait, load, travel, unload or dump ...
اقرأ أكثرReclamation Cost Estimate 12.4.15
Excavating, bulk bank measure, 3.5 CY, hydraulic excavator, crawler mounted 31 23 16 42 0305 $1.56 BCY 60 BCY 60 LCY $93.60 Subtotal $15,143.60 Total $40,092.34 BCY - bank cubic yard CY - cubic yard HP - horsepower LCY - loose cubic yard MPH - miles per hour. PROJECT: Daneros Mine Rec. Cost. Est. COMPUTED BY : RE CHECKED BY: AR
اقرأ أكثر